Originally built in 1997 and was transformed in 2023
To Replace existing direct fixed fibre cement sheet cladding with New Timber Bevelback weatherboards over cavity.
All existing joinery to be replaced with double glazed low E joinery.
The Creation of a Scullery to the New Designed Kitchen.
New Plumbing fixtures to bathroom.
Roof extension to garage with new gable supported by engineered timber feature and columns, concrete tile all painted white.